Excavate and Prepare Sub-Grade
0:30
15:19
554.2K views
At 0:30 in
How to Build a simple Ground level Deck in a weekend
What happens here
The project begins with site preparation, which involves significant excavation to ensure adequate airflow beneath the deck. Approximately 60-65 wheelbarrow loads of dirt are removed to create a sub-grade that allows for proper ventilation and prevents the deck from being suffocated by stagnant air or moisture. This step is crucial for the longevity of the deck and involves establishing the correct elevation for the deck's foundation.
Goal: Create a level and ventilated area beneath the deck.
Tools and materials
- Shovel — Digging and moving dirt
- Wheelbarrow — Transporting excavated dirt
- Dirt — To be removed from the site
What they say
(1,488 characters)Hide
What they say
(1,488 characters)Auto-generated from the video audio.