Site Excavation and Base Preparation
At 1:26 in
How to build a Retaining Wall
What happens here
The next phase involves extensive excavation to enlarge the lower area, creating what is referred to as a 'courtyard effect.' The upper layers of the existing Versa-Lok retaining wall are carefully removed, leaving only the bottom course exposed, which is 'stair-stepped back' or 'beated down' to provide a clean starting point for the new construction. For the foundation of the new wall, a base layer of 3/4 inch clear angular stone is spread. The presenter highlights the importance of using angular stone instead of rounded pea rock or Class 5 material because its irregular shapes interlock when compacted, providing superior strength and stability, which prevents shifting and differential settlement. This base layer will be lightly compacted to ensure a solid foundation.
Goal: Prepare the site by excavating and creating a stable, strong base for the new retaining wall sections.
Tools and materials
- Compactor — To compact the base material for a stable foundation
- Excavation Equipment — To remove soil and create the new flat area
- 3/4 inch Clear Angular Stone — Creating a strong, interlocking base for the retaining wall
What they say
(2,106 characters)Hide
What they say
(2,106 characters)Auto-generated from the video audio.