Skip to main content

Establish Permanent Access and Drainage

3:30
6:32
120.5K views

At 3:30 in

How to Build a Boulder Retaining wall

What happens here

Tools and materials

  • PVC Pipes
  • Structural Fill Soil

What they say

Hide

through the middle. But not just us. Permanently, the customer who has forever had no access to this lake with anything but what he could carry in his own two hands will no longer have steps. He's going to have a nice ramp that he could drive a boat down if he wanted to. He could um drive a lawn mower down here. He can do maintenance. He can gain access. So, we're going to crawl up this hill and I'm going to show you some of the equipment we're going to use to tackle this project. A job like this, 3, four weeks at minimum if you want to do it right. We got about 400 cubic yards of structural fill soil coming in. We've got about 2,000 square ft of Boulder engineered boulder retaining walls that we're going to be building on this site. Not just boulder walls, but boulder walls fortified with a 3.0 0 geog grid certified, stamped, gone through licensing, permitting, gone through all the requirements, surveying with the

Auto-generated from the video audio.