The video begins by introducing concrete edging, clarifying that it involves individual, hand-laid units rather than continuous poured concrete. This characteristic makes it significantly more labor-intensive. The material cost for these concrete edging units is then established at approximately $2.25 per lineal foot, noting that this is comparable to the material cost of steel edging.

Goal: Determine the material cost per linear foot for concrete edging units.

Tools and materials

  • Concrete Edging Units — The primary material for the edging installation project

What they say

Hide

all right last and I like to call it least because this is one of my least favorite products to install is the concrete edging now I'm not talking about the poured continuous concrete edging what I'm actually referring to is the individual units that stack Side by each the reason I don't like to do it is it's very labor intensive but let's walk through the process and get our material cost First of course so the concrete edging depends on what you use is going to be in this example about $225 per linear foot so very similar to the steel edging in this case but now on

Auto-generated from the video audio.