Skip to main content

Add Overheads and Finalize Base Price

1:58
4:25
15.3K views

At 1:58 in

How to Bid CONCRETE Edging

What happens here

After determining both material and labor costs, additional factors must be considered. If the existing ground is soft or spongy, an additional layer of sand may be required as a stable base, which will increase the material cost. Combining the previously calculated material cost ($2.25/L.f.) and labor cost ($4.33/L.f.) gives a subtotal of $6.58 per linear foot. To ensure a profitable bid, an additional 10% is added for profit and overhead. This adds $0.67 (10% of $6.58), bringing the technical cost to $7.42 per linear foot. For the sake of simplicity and to provide clear, easy-to-understand options for customers, this is rounded up to $7.50 per linear foot.

Goal: Establish a final, profitable price per linear foot that includes all direct costs and a margin for profit/overhead.

Tools and materials

  • Sand — To provide a stable base for concrete edging on uneven or soft ground

What they say

Hide

may need to import sand which has the possibility of raising your material costs up even more it depends on the conditions that you're working in but if we just stick with this scenario $433 for labor 225 per linear foot for material cost we add that up it comes a $6.75 per linear foot add 10% profit and overhead that gives you another 67 on top of that and technically it comes out to

Auto-generated from the video audio.