Initial Site Assessment & Problem Identification

0:00
30:00
17.9K views

At 0:00 in

How NOT to build a retaining wall

What happens here

The project begins with an initial site assessment, where workers are observed preparing the ground and discussing the challenges of the sloped terrain. A pre-existing retaining wall near a gas meter is shown, which was pushing on the meter, indicating a failure of the previous structure. This segment sets the stage for the need for proper engineering and construction on sloped landscapes.

What they say

Hide

Uh he had tried to get a wood chipper down there before or a spider and and just couldn't get anything between these houses and it uh he rolled >> sketchy mowing. >> So this wall this was falling down boulder wall that was pushing on the gas meter. >> Not a boulder wall. It was a pile. >> Show them how tough this ground is. Tim.