Skip to main content

Constructing Lower Retaining Wall Sections

0:45
30:00
17.9K views

At 0:45 in

How NOT to build a retaining wall

What happens here

Workers meticulously construct the initial courses of the retaining walls. This involves leveling the ground, laying a foundation of gravel, installing layers of geogrid (geo-textile reinforcement) between block courses for structural integrity, and stacking modular concrete blocks. The process ensures that walls are spaced correctly to avoid 'surcharge' issues where one wall's weight negatively impacts another. An excavator assists with moving rocks and dirt to support the wall layers.

Goal: The team begins building the lower sections of the retaining wall system. This involves laying down a base layer, installing geogrid for stability, and carefully stacking modular concrete blocks to form the wall structure, emphasizing proper spacing and engineering principles.

Tools and materials

  • Excavator
  • Geogrid (Geo-textile reinforcement)
  • Level
  • Modular Concrete Blocks
  • Rubber Mallet
  • Skid Steer
  • Gravel

What they say

Hide

the the battery packs on out. Sorry. Heat. [Music]

Auto-generated from the video audio.