Regrade Yard for Final Drainage
12:58
18:32
61.9K views
At 12:58 in
How Much MONEY Do Landscapers REALLY MAKE ?!? 4 k
What happens here
Following the installation of the patio and drainage system, the surrounding yard is regraded. This involves moving soil using the compact track loader and hand tools to create a gentle, consistent slope that directs surface water away from the house and towards the newly installed drainage lines or a natural runoff area. The regrading ensures that the entire landscape contributes to effective water management.
Tools and materials
- ASV RT-75 Compact Track Loader
- Hand Rakes
What they say
(225 characters)Hide
What they say
(225 characters)Auto-generated from the video audio.