Skip to main content

Regrade Yard for Final Drainage

12:58
18:32
61.9K views

At 12:58 in

How Much MONEY Do Landscapers REALLY MAKE ?!? 4 k

What happens here

Following the installation of the patio and drainage system, the surrounding yard is regraded. This involves moving soil using the compact track loader and hand tools to create a gentle, consistent slope that directs surface water away from the house and towards the newly installed drainage lines or a natural runoff area. The regrading ensures that the entire landscape contributes to effective water management.

Tools and materials

  • ASV RT-75 Compact Track Loader
  • Hand Rakes

What they say

Hide

[Music] so we ended up having quite a bit of dirt left so we were able to kind of regrade back here and up off the side of the house and there was a big freaking crater over here kind of where joey was standing and whatnot so

Auto-generated from the video audio.