Skip to main content

Position Service Entrance Cable Assembly

1:50
2:05
164.2K views

At 1:50 in

How installing a 200 AMP Service looks like in New Jersey for a Resi Home,Prepping the Wire #advice

What happens here

With the service entrance cable fully prepared and the weatherhead installed, the assembly is now ready to be put into its final position on the building. This typically involves lifting the cable up to the service mast or attachment point on the house. Ensure the weatherhead is positioned correctly to provide weather protection and the cable is routed appropriately to the main service panel.

Goal: Place the prepared service cable onto the house for utility connection.

Tools and materials

  • Ladder — Reaching high service connection points
  • Service Entrance Cable Assembly N/A — The completed cable and weatherhead unit

What they say

Hide

nice and straight. Mhm. And this is what you should be doing as an apprentice every time you do a service. Prep it. Prep it like this. Yeah. You could have done that at the shop. Yep. or when you soon as you get here. I snuck your head on. There you go. That's my first weather head. Really? Yeah. You could you could

Auto-generated from the video audio.