What happens here
With the service entrance cable fully prepared and the weatherhead installed, the assembly is now ready to be put into its final position on the building. This typically involves lifting the cable up to the service mast or attachment point on the house. Ensure the weatherhead is positioned correctly to provide weather protection and the cable is routed appropriately to the main service panel.
Goal: Place the prepared service cable onto the house for utility connection.
Tools and materials
- Ladder — Reaching high service connection points
- Service Entrance Cable Assembly N/A — The completed cable and weatherhead unit