Skip to main content

Structural Demolition and Material Separation

1:33
1:58
3.3K views

At 1:33 in

House Demolition (Time Lapse)

What happens here

After the internal contents are removed, proceed with the full structural demolition of the house. During this phase, carefully separate different types of materials, such as the concrete from the basement and the timber framing and other wooden components from the upper structure. These sorted materials are then transported to appropriate recycling facilities, minimizing landfill waste.

Goal: Completely demolish the house structure and sort materials for recycling.

Tools and materials

  • Dump Truck — Transporting separated materials to recycling or disposal sites
  • Excavator Kobelco — Breaking down the structure and sorting debris

What they say

Hide

five or six hours on average so that's a service that we'd like to provide extra to the homeowners when we're done cleaning out the house and separating the personal debris then the house itself can come down that gets recycled that gets brought down separated the concrete basement is separated from the timber structure above they go to different locations and then we backfill the hole flatten it out and get it ready so that green grass can be planted on it in the springtime when uh the temperatures

Auto-generated from the video audio.