Prepare Gully and Position Culvert
0:45
20:43
70.6K views
At 0:45 in
Hope she approves! Big boy toys clearing fence lines thick brush, building our farm!
What happens here
Once the path is cleared, use a Gehl RT210 compact track loader to further excavate and level the gully where the culvert will be placed. Attach a heavy chain or strap to the culvert pipe and use the skid steer to slowly and carefully pull the large culvert pipe down into the prepared gully. Ensure the pipe is properly aligned to facilitate efficient water flow and prevent future erosion or flooding.
Goal: Excavate and prepare the gully to receive the culvert pipe, then use a skid steer to carefully pull the large culvert pipe into its final position.
Tools and materials
- Gehl RT210 Compact Track Loader
- Heavy chain or strap
- Large culvert pipe
What they say
(502 characters)Hide
What they say
(502 characters)Auto-generated from the video audio.