What happens here

Heavy machinery, specifically a skid steer and an excavator, are used for the initial excavation of the trench. Workers then manually spread a layer of gravel into the trench, which is subsequently compacted using a vibratory plate compactor. This process establishes a stable and level foundation for the retaining wall, critical for its long-term stability and safety.

Goal: Workers use an excavator and manual tools to dig a trench, then place a base layer of gravel, followed by compaction to prepare for the retaining wall blocks.

Tools and materials

  • Excavator
  • Leveling Tool (Yellow)
  • Shovel
  • Skid Steer
  • Vibratory Plate Compactor
  • Gravel Unspecified