Skip to main content

Apply Subsequent Coats and Allow Final Drying

8:00
8:21
183.3K views

At 8:00 in

Hardwood Floors-Repair, Refinish, and Restore - DIY Home renovation

What happens here

After applying the first coat, allow it to dry according to the product's instructions. If you are within the recommended re-coat window (3-4 hours for the Minwax product shown), proceed with applying the second and third coats using the same 'wet edge' method as the first coat. If more than 12 hours have passed since the previous coat, you must lightly sand the entire floor with 220-grit sandpaper to create a bonding surface, and then thoroughly re-tack it using sticky dust cloths to remove all generated dust before applying the next coat. After the third and final coat is applied, stay off the floor completely for at least 24 to 48 hours to allow the polyurethane to cure sufficiently before any heavy foot traffic is permitted. Always refer to your product's specific recommendations for full cure times and when it's safe to place furniture back.

Goal: Complete the polyurethane application process and allow the floor to cure properly for durability.

Tools and materials

  • 220-Grit Sandpaper — Light sanding between coats if more than 12 hours pass between applications
  • Floor Mop — Holding dust cloths for re-tacking after sanding between coats
  • Gloves — Protecting hands
  • Paint Tray — Holding polyurethane for application
  • T-bar Applicator — Applying subsequent coats of polyurethane

What they say

Hide

during the second and third coat. So, now that you got your third and final coat on, stay off the floor for at least 24 to 48 hours with heavy foot traffic. Now, if this video's helped you guys out, do me a favor and hit the like button, comment down below, or do me a big favor and hit the share button. God bless. Go get them. Dirt Monkey out. I think I need to go run an excavator somewhere.

Auto-generated from the video audio.