Repeat Paver Installation Process and Finish
At 0:07 in
Had to bring out the Paver Sucker 3000 for these big slabs!
What happens here
Continue the process of securing, lifting, transporting, positioning, and releasing pavers until the entire area is covered. As you progress, periodically check the overall levelness and alignment of the installed pavers. Make any necessary adjustments by gently lifting and re-seating pavers, or by using a rubber mallet and a level. After all pavers are laid, the final steps (not shown) would typically include installing edge restraints to prevent movement, sweeping polymeric sand into the joints, and wetting the polymeric sand to activate its bonding properties, which locks the pavers together.
Goal: Complete the paver installation, ensuring all pavers are properly laid and secured.
Tools and materials
- Broom — Sweeping polymeric sand into joints
- Long Level — Checking the overall levelness of multiple pavers
- Rubber Mallet — Adjusting pavers
- Vacuum Paver Lifter Likely Makinex — Lifting and placing all subsequent pavers
- Edge Restraints — Preventing pavers from shifting outwards
- Polymeric Sand Alliance Gator — Filling paver joints to lock them in place and inhibit weed growth