Initial Spreading and Rough Screeding
0:00
0:22
6.9K views
At 0:00 in
Guess how many yards of concrete. Winner gets a tshirt!
What happens here
After concrete has been poured into the prepared forms, the initial step involves spreading the wet concrete evenly and beginning the rough leveling process. Use a concrete rake or placer to distribute the concrete across the slab area, ensuring it fills the formwork. Simultaneously, or immediately after spreading, use a power screed to begin drawing across the concrete, removing excess material and vibrating the concrete to start compaction. This initial pass helps to establish a consistent surface height.
Goal: Distribute concrete evenly and perform initial leveling across the slab.
Tools and materials
- Concrete Rake — Spreading and distributing wet concrete
- Gloves — Protecting hands from wet concrete
- Power Screed — Vibrating and leveling the concrete surface
- Rubber Boots — Protecting feet from wet concrete
- Safety Glasses — Protecting eyes from splashing concrete