Skip to main content

Introduction to Backyard Grading & Drainage Principles

0:00
14:01
70.9K views

At 0:00 in

Grading a Back yard with an ASV Tracked skid steer

What happens here

The project begins with an introduction to the task of grading a backyard that previously contained a swimming pool. The primary goal is to establish proper water drainage away from structures. The narrator explains a fundamental grading rule: a 1-inch drop for every 8 feet of horizontal run away from the house's foundation or any hard surfaces like a patio. The ASV RT-75 compact track loader is showcased as the chosen equipment for this job, demonstrating its initial movements within the cleared backyard area.

Goal: Understand the project scope and establish initial drainage guidelines.

Tools and materials

  • ASV RT-75 Compact Track Loader ASV — Initial movement and demonstration of machine capabilities
  • Yard with excavated pool area N/A — The area to be graded

What they say

Hide

so Tim is on one end of town running the Volvo and Blaine is on another end of town running the ASB what you look at something here how much room he's got he's he's got zero room between the fence there's time he loves being on camera

Auto-generated from the video audio.