Establish Subgrade and Drainage Slope

1:00
14:01
70.9K views

At 1:00 in

Grading a Back yard with an ASV Tracked skid steer

What happens here

The operator explains a crucial grading rule: ensure a 1-inch drop for every 8 feet of run away from any structure, such as the existing concrete slab or the house foundation. This is to guarantee proper water runoff and prevent pooling. The ASV loader begins to push and spread soil, establishing this critical slope. This initial layer is referred to as the 'subgrade', which is the base layer before any final topsoil is added.

Goal: Create the correct subgrade slope for effective water drainage away from structures.

What they say

Hide

he loves being on camera here's a few simple rules we follow when we're grading we always look for one inch of drop for every eight feet of run away from a structure or higher surface so you see that concrete slab as he's moving away to his left and eight feet he should have one inch of drop from the elevation of that concrete slab [Music] but right about there used to be a swimming pool but we ended up removing it using this ASB 75 we couldn't get any other piece of equipment into the backyard on this jobsite I'm going to show you why in just a few moments but now that we've got the demolition all done it's time to move on to the grading portion of this so this grading part I think is probably one of the most important things because this is what we leave the customer with and this is lay the yarn of looking for and 20 I don't know maybe forever I don't know so when we're grading we really concentrate on making sure that we get the water to pinch to the bartha's back point of the property or to the sides unless if we're pitching it to the sides we're pitching it into somebody else's structure then we've got to look for somewhere else to pitch that water let's watch how this ASB does greeting out this backyard now this is what's called the subgrade this is a final layer of dirt we still have black dirt that will come in and gets run on top of that we don't drive over that black dirt we do drive over the subgrade because this is like the pool table surface that we've got to get every pitch nuance crack and crevice exactly right this part takes a long

Auto-generated from the video audio.