Monitor & Finalize Pile Installation

0:10
0:21
10.4K views

At 0:10 in

GoliathTech is here, you know what that means!!

What happens here

As the helical pile is driven deeper, ground crew members should continuously observe its vertical alignment, using levels if necessary, and ensure it's following the intended path. The excavator operator receives feedback from torque monitoring equipment and visual cues to ensure the pile reaches the specified installation criteria (depth and torque). Once the target depth and torque values are achieved, the hydraulic drive is disengaged, and the excavator is moved away, leaving a securely installed helical pile ready to support the generator's foundation.

Goal: Throughout the driving process, ground crew members monitor the pile's progress and alignment, ensuring it is installed to the precise depth and torque specifications for a stable foundation.

Tools and materials

  • Excavator
  • Helical Pile
  • Hydraulic Rotary Drive Head
  • Spirit Level or Laser Level (Implied)
  • Torque Monitor