At 0:10 in
For this amount of concrete, are you calling in a truck or are you hand mixing? Be honest.
What happens here
Once the concrete is roughly spread, use a straight edge, commonly known as a screed board or strike-off board, to level the concrete to the top of the formwork. This tool should be long enough to span the width of the form. Place the screed board on the edges of the formwork and use a sawing motion while pulling it across the surface. This action removes excess concrete and creates a flat, level surface. It may require multiple passes and often works best with two people, one on each side of the screed board.
Goal: Level the concrete to the top of the formwork
Tools and materials
- Screed Board / Straight Edge — Leveling the concrete to the top of the forms