Backfill and Regrade
At 8:00 in
Fixing a Wet Lawn
What happens here
Once the drainage rock is in place, fold the excess drainage fabric over the top of the rock to completely encapsulate the gravel and pipe, preventing soil from mixing with the drainage layer. Then, use the stored excavated soil to backfill the trench, covering the fabric-wrapped rock. Compact the soil lightly and regrade the area to create a positive slope away from the house, directing surface water away from the foundation. Any excess soil not needed for grading can be removed from the site. Finally, lay the reserved sod back over the refilled trench.
Goal: The drainage fabric is folded over the gravel, and the trench is backfilled with excavated soil. The area is then regraded to ensure proper surface water runoff away from the house.
Tools and materials
- Mini Excavator (Bobcat)
- Rake
- Shovel
- Excavated Soil
- Sod
What they say
(1,350 characters)Hide
What they say
(1,350 characters)Auto-generated from the video audio.