Skip to main content

Initial Demolition - Fine Control Practice

1:48
6:55
206.7K views

At 1:48 in

First Day on the Job and He Has to Demolish a House

What happens here

The first tasks for the new operator, Chant, focus on developing a feel for the excavator's fine controls. He begins by carefully removing an awning from the side of the house, requiring precise manipulation of the bucket. Following this, he is challenged to save a metal railing, demonstrating the delicate touch needed with the large machine before moving on to more destructive tasks. The instructor emphasizes getting a sense of how the machine operates rather than just smashing into the house.

Goal: Develop fine motor control with the excavator through precise, non-destructive tasks.

Tools and materials

  • Case CX210D Excavator Case — Performing precise demolition tasks

What they say

Hide

currently breaking through the ice layer to work. Can Chance delicately remove the awning from the house ? If Tim had been on board , do you know what mission I would have given him? You probably asked if you could unscrew the light bulb out of the socket. At one time, we called him the 'Kobel Ko Team '. Tim, why did we call you that? I could n't get off at Kobelco . Look at Bill over there. Bill has a look on his face that says, "I'm not going to talk about Kobel Co. here." I don't know what that is. Look at that. Okay, the next challenge is to demolish it while preserving the railing as well. The reason for doing this is to get a feel for how the machine works before he starts demolishing the house in earnest . The next scene you will see is him actually going through the roof , so we need to stop him

Auto-generated from the video audio.