Controlled Demolition - Upper Structure
2:32
6:55
206.7K views
At 2:32 in
First Day on the Job and He Has to Demolish a House
What happens here
The operator progresses to demolishing larger sections of the house's upper structure. During this process, a critical safety point is highlighted: preventing debris from coming into contact with the excavator's hydraulic cylinders (the silver parts of the boom arm and bucket). Such contact can score the cylinders, leading to expensive damage. The instruction is to carefully bring down sections of the house, depositing debris within the house's footprint, while actively protecting these sensitive components.
Goal: Safely remove the house's upper structure while protecting the excavator's hydraulic components.
Tools and materials
- Case CX210D Excavator Case — Demolishing house sections and managing debris
What they say
(530 characters)Hide
What they say
(530 characters)Auto-generated from the video audio.