Prepare Sand Bed for Pavers
At 4:04 in
FINISHING the Raised Paver deck & curved staircase- "the Scooby Project" pt2
What happens here
Measure the depth from the top of the retaining wall blocks to the compacted Class 5 base to ensure there is adequate space for the paver bedding sand. Adjust the base if necessary (e.g., add more Class 5 if too low). Place metal pipes (screed pipes) across the prepared base to act as guides for uniform sand depth. Spread a thin layer of paver leveling sand (approximately 3/4 to 1 inch deep) over the base. The screed pipes will help maintain consistent depth as the sand is leveled.
Goal: Check the final depth for the sand layer, place screed pipes, and then spread and level a thin layer of sand as the bedding for the pavers.
Tools and materials
- Metal Pipes / Screed Pipes — Guiding uniform sand depth for leveling
- Reciprocating Saw — Cutting screed pipes to length
- Shovel — Spreading sand
- Tape Measure — Measuring depth for sand base
- Paver Leveling Sand — Creating a level bedding layer for the pavers
What they say
(961 characters)Hide
What they say
(961 characters)Auto-generated from the video audio.