Backfill and Compact Base Material
At 2:20 in
FINISHING the Raised Paver deck & curved staircase- "the Scooby Project" pt2
What happens here
Use a mini skid steer (Case ASV RT-50) to transport and dump recycled Class 5 aggregate into the enclosed area formed by the retaining wall blocks. This material serves as the primary structural fill for the raised patio. After spreading the aggregate, use a vibratory plate compactor (Tomahawk) to compact the material thoroughly. Repeat this process in layers to achieve maximum density and stability. This deep compaction helps prevent future settlement and ensures the longevity of the patio.
Goal: Fill the interior of the retaining wall structure with Class 5 aggregate and thoroughly compact it to create a stable base for the patio.
Tools and materials
- Mini Skid Steer — Transporting and spreading aggregate
- Rake/Shovel — Spreading aggregate evenly before compaction
- Vibratory Plate Compactor — Compacting base material
- Recycled Class 5 Aggregate — Structural fill for the raised patio base
What they say
(1,209 characters)Hide
What they say
(1,209 characters)Auto-generated from the video audio.