Laying Geogrid for Reinforcement
At 0:59 in
Fighting a Landslide - Heavy Equipment against Natural Disaster
What happens here
After the initial excavation, a worker manually unrolls a dark, mesh-like geogrid material onto the prepared slope. The geogrid is strategically placed to extend beyond the potential failure plane into the stable, undisturbed soil at the base and sides of the excavation. This creates a strong, interlocking structure within the soil layers, enhancing the slope's stability. The narrator specifies using at least one foot of geogrid into the hill for every foot of failure above the hill, layering it in two-foot (or ultimately one-foot) increments.
Goal: Geogrid is unrolled and secured into the newly excavated slope, extending into undisturbed soil to reinforce the hillside against future slides.
Tools and materials
- Geogrid
What they say
(514 characters)Hide
What they say
(514 characters)Auto-generated from the video audio.