Fighting a Landslide - Heavy Equipment against Natural Disaster

5:38
26.2K views

Video by Stanley "Dirt Monkey" Genadek

Stanley "Dirt Monkey" Genadek

What happens here

This project details the process of reconstructing a hillside slope that failed due to heavy rains, causing a path to collapse into a lake. The reconstruction involves excavating the compromised soil, laying multiple layers of geogrid for reinforcement, backfilling with new soil, and compacting it to create a stable and resilient slope. The video also explains the mechanics of landslides and highlights the challenges posed by subsurface water.

Transcript

Hide

Starting to rain. Just can't get a break, man. It's literally three miles that way. Blue skies, clear sun is shining, and we get out here to start on a a slope reconstruction. The county's hired us to uh rebuild the slope that has failed. If you see behind me, you see a big tarp covering the slope. Above that tarp is a path, a walking path, [music] a bike path, whatever kind of path you want to call it. And uh last year from all the heavy rains we've had, the entire path just kind of went and uh washed down into this lake below it. So, we're out here to reconstruct that slope and put it back together. So, we've worked with an engineering firm and what we're going to be doing is we're going to be tearing this slope out. We're going to be putting grid in in layers and then putting the soil back in place and packing it. You can see the packer behind us. But, uh, I'm going to take you up closer and show you what's going on. First off, let's understand what a landslide is. This is your embankment. A landslide doesn't start at the top and slough down. What happens is a landslide slide starts underneath on a U-shaped pattern [music] and then the whole mass of soil. This whole wedge of soil slides down at once. To correct an issue like that, it's the same principles we use when we build engineered retaining walls. We've got to reinforce that soil, but if we if our slope of failure is here, we've got to bring geogrid beyond that. [music] We've got to connect into the solid undisturbed soils and then replace the fascia soil [music] that's here. In this case, we weren't building a retaining wall, but it was the exact same principles. So, we kicked the idea past the county who then kicked the idea past the Army Corps of Engineers who then got permission from Homeland Security. Yes, Homeland Security was involved in this project. Why? No clue. Here's the slope. Here's the U-shaped zone of failure. This whole [music] thing flopped down. Basically, we layer sandwich geog grid. Boom. Boom. Boom. Boom. All the way past the U-shaped point. We catch the solid soil. We put everything back in place and pack it. That's a simplified technique. In actuality, what we like to use is at least one foot of geog grid into the hill for every foot of failure above the hill. So if we have a 15 or a 20 foot 20 ft of failure, we're going to try to catch that much grid into the slope and into the toe of the hill as well. We're going to layer that in 2 foot increments. Every 2 ft, we're going to put another row of geog grid. In this case, the soil was extremely wet. What we found during the excavation, we found water coming through the hill. That's why this this uh landslide occurred. Water's telling me, Tim, water's coming through the hill. Oh yeah, I got a regular shovel. Holy crap. So you you can just push the shovel right into the hillside. Shouldn't be able to do that. Not a chance. Unless you're freaking Hulk, right? But you are kind of a big tough guy. He has been hitting He's been doing P90X a little, I think. There you go. There's some water right here. Unless Yoken took a leak there. You didn't take a leak there, did you? No. All right. Yeah, that's water. Coming through the hill. So, that's coming right through the hill, in fact. So, what is your what is your escape route from up here, Tim? Ride it down. Ride it down the You got brown shorts on today, right? Always brown. No, pretty used to it, man. cuz it wasn't just coming down on the top and then was able to come in behind it. It was actually streaming through the entire hill structure which released the whole thing. So I tried to get the county to opt to put aggregate a draining zone in. I really wanted to put a 3-FFT draining zone in and then a chimney pipe, [music] a drainage pipe. So you've got a draining zone at the bottom 3 ft thick and then also up the backside of the dirt pile. So any water that perks through the hill, hits the drainage zone, goes down, goes out, won't affect the soil that we work, but the county wouldn't buy on it. It was a big add-on. I mean, it would have almost tripled the size of the project. But in my mind, I felt like that was what was needed. Instead, what we did was we did increase the amount of geog grid. That helps a little bit. It's not the end all be all. So instead of twoft increments, we opted for one foot increments. It's better than nothing. It's better than nothing. I wanted [music] to put the drainage pipe in the drainage zone. I firmly feel that would have been the solution, but in this case, the county wouldn't bite on that. Let's walk through. Let's let's continue to show you this project.

Auto-generated from the video audio.