Skip to main content

Direct Initial River Rock Placement

2:18
11:59
40K views

At 2:18 in

EXCAVATOR GETS TOO CLOSE TO THE POND!! BUILDING A "ROCK FISHING PLATFORM"

What happens here

The presenter begins to direct the excavator operator, instructing him to 'send him right there' and 'take that one and set it out as the next step.' He also provides crucial guidance on maintaining proper distances between the rocks, advising the operator to 'leave about that much space' for the subsequent steps. This marks the critical initial phase of installing the river rock pathway, where foundational rocks are positioned according to the desired layout for hopping across.

Goal: The first river rocks are strategically placed into the pond, with the presenter guiding the excavator operator on where to position them and suggesting appropriate spacing for the pathway.

Tools and materials

  • Excavator (CAT 318C L)
  • Large River Rocks

What they say

Hide

out here and fish in my fish pond so that's what I want so let's watch him do it I'm gonna direct rock traffic should be fun can't have fun what good's life send him right there take that one and set it out as the next step and then we'll take bigger and bigger out to the next steps leave about that much space in between them if you can this guy's looking at me like I'm an idiot paying

Auto-generated from the video audio.