Digging a Trench for Silt Fence Installation
0:11
3:14
84.4K views
At 0:11 in
Erosion Control and Silt Fence
What happens here
The worker manually digs a trench using a square shovel along the perimeter where the silt fence will be installed. The presenter states that a trench of approximately 6 inches deep is required to properly "toe in" or bury the bottom of the silt fence. He also highlights that dedicated trenching machines or edgers can be used for a quicker and straighter cut.
Goal: Create a sufficient trench for securely burying the base of the silt fence.
Tools and materials
- Edger — Mechanical alternative for cutting a straight trench
- Square Shovel — Used for manual digging of the trench
- Trenching Machine — Dedicated machine for digging trenches
- Soil N/A — Material being excavated for the trench