Track Loading and Preparation for Testing
16:34
25:36
85.3K views
At 16:34 in
Equipment Track buying guide- what they DON'T tell you
What happens here
Stanley loads two new skid steer tracks, placed on a wooden pallet, onto the bed of his pickup truck using a skid steer. Later, Alex begins the process of removing an existing track from a Kubota SVL 75-2 skid steer. This involves unscrewing the grease zerk to release pressure in the track tensioning system. Alex also prepares a 'track handler' tool (a piece of flat metal) to assist in rolling the track off the machine.
Goal: New tracks are loaded onto a truck using a skid steer, and existing tracks on a Kubota SVL 75-2 are prepared for removal to install the new ones.
Tools and materials
- Grease Zerk
- Kubota SVL 75-2 Skid Steer
- New Skid Steer Tracks
- Pickup Truck
- Track Handler Tool
- Wooden Pallet
- Wrench/Socket
What they say
(701 characters)Hide
What they say
(701 characters)Auto-generated from the video audio.