Route Interior Wiring
At 0:08 in
Electrician Job Pricing, and advice how to price correctly #electrican #contractor #ev
What happens here
Once the breaker is installed, route the 6/2 Metal Clad (MC) cable from the main electrical panel up into the ceiling joist space or along the basement walls. The video shows the cable running vertically from the panel, then horizontally along the wooden joists. Secure the MC cable to the framing members (joists or studs) every 4.5 feet or less, and within 12 inches of boxes or enclosures, using appropriate cable straps or staples. Plan the route to minimize bends and avoid obstructions, ensuring the cable is protected and neatly organized.
Goal: Run the EV charger cable from the electrical panel to the exterior wall
Tools and materials
- 6/2 Metal Clad — The primary conductor for the 60-amp EV charger circuit, running inside the house
- Cable Straps or Staples — Securing the MC cable to wooden joists and studs
- Cordless Drill — To drill holes through framing for cable passage
- Drill Bits — Creating holes for cable routing
- Hammer — To drive cable staples if used
- Tape Measure — Measuring cable lengths and spacing for securing