Skip to main content

Spread and Compact Base Material

6:46
29:25
2.8M views

At 6:46 in

Easiest Patio Pavers You'll Ever Install!

What happens here

Begin by transporting and spreading road mix (crushed rock with fines) evenly across the excavated area. A riding lawnmower with a trailer and dump cart is used for efficiency. Aim for a base layer thickness of 4 to 5 inches. Use a rake to spread the road mix smoothly, ensuring proper drainage by allowing for a slight slope away from any adjacent structures (e.g., house, garage). Once spread, compact the road mix thoroughly using a plate compactor to create a dense and stable foundation for the patio. Perform multiple passes with the compactor for optimal compaction.

Goal: Create a stable and compacted road mix base.

Tools and materials

  • Hand Tamper — Compacting small areas or edges where the plate compactor can't reach
  • Plate Compactor Tates Rents — Compacting the road mix base
  • Rake — Spreading and leveling road mix
  • Ryobi Dump Cart Ryobi — Hauling and dumping road mix
  • Ryobi Riding Lawn Mower Ryobi — Transporting road mix efficiently
  • Shovel — Assisting with spreading road mix
  • Road Mix — Creating the compacted base layer