Sub-Base Preparation and Compaction
At 4:08 in
Double Terraced Retaining wall crashes down pt2
What happens here
This step focuses on establishing a robust and level foundation for the retaining wall. First, any reusable excavated topsoil is carefully separated and piled to the side. The bottom of the excavated trench is then meticulously leveled using a shovel, ensuring a consistent depth. A thin layer of 3/4 inch clear road gravel is spread across the trench floor. This gravel layer serves two purposes: providing initial stability and improving the traction for the compaction equipment. A NorthStar plate compactor is then used to thoroughly compact the gravel, ensuring maximum density and eliminating any potential for settling. For areas where the plate compactor cannot reach, such as tight corners or near the existing structure, a hand tamper is utilized for manual compaction, guaranteeing uniform solidity across the entire sub-base. Work gloves are used for hand protection.
Goal: Create a solid, level, and highly compacted sub-base for the retaining wall blocks.
Tools and materials
- Hand Tamper Generic — Compacting small or hard-to-reach areas of the sub-base
- NorthStar Plate Compactor NorthStar — Thoroughly compacting the gravel sub-base
- Shovel Generic — Leveling the trench bottom and spreading gravel
- Work Gloves Generic — Hand protection during manual labor
- 3/4 inch Clear Road Gravel Generic — Creating a stable and level sub-base for the retaining wall
What they say