Backfilling and Upper Wall Demolition

9:27
14:14
84.7K views

At 9:27 in

Double Terraced Retaining wall crashes down pt2

What happens here

This phase involves two concurrent activities: backfilling the new retaining wall with drain rock and continuing the demolition of the old upper retaining wall. After the first courses of the new wall are laid, 3/4 inch clear drain rock is introduced behind the blocks. A skid steer (Cat skid steer) is used to dump the rock, with a worker using a shovel to mark precise drop points. Other workers then use shovels and rakes to evenly spread and compact the drain rock into the backfill area, ensuring stable drainage. Simultaneously, the Bobcat T325 mini excavator is deployed to carefully remove the remaining sections of the previously existing upper retaining wall. This removal is critical for establishing the new grade and preparing the site for the final landscaping. The removed old wall materials are collected by the skid steer for disposal. The presenter emphasizes the use of 3/4 inch clear angular rock due to its superior interlocking properties compared to Class 5, which prevents movement and provides excellent drainage. Safety equipment like work gloves and safety glasses are used during this process.

Goal: Stabilize the new wall with drain rock backfill and remove the remaining old upper wall sections.

Tools and materials

  • Bobcat T325 Mini Excavator Bobcat — Demolishing remaining sections of the upper retaining wall
  • Cat Skid Steer Cat — Transporting and precisely dumping drain rock behind the retaining wall
  • Rake Generic — Evenly distributing drain rock behind the wall
  • Safety Glasses Generic — Eye protection during machinery operation and material handling
  • Shovel Generic — Spreading drain rock evenly and marking dump locations
  • Work Gloves Generic — Hand protection
  • 3/4 inch Clear Road Gravel — Backfilling behind the wall to provide drainage and support

What they say

Hide

like a glove it's like you've done that a couple of times you guys are tuning in from part one you know that Alex is in training to be a foreman but he's also in training to be a baser and so this is the perfect kind of projects we like to put people that are in training on shorter retaining walls four foot in under [Music] fan places the shovel to mark the center of where you want Lane to dump the draining name with the bottom wall getting close to height they feel comfortable enough to take out the upper wall play it safe and not jeopardize that upper Dhiraj a lot of the removals are done by hand all right so we got drain tile down the class five in up to this point and originally this was a little two-tier wall so there was one here and then obviously one that we've been tearing out but what we're going to do next is start adjusting this great we're going to be shaving it down