Lay and Level Initial Aggregate Base
At 6:40 in
Double Terraced Retaining wall crashes down pt2
What happens here
After the trench is compacted and the drain tile is in place, dump and spread a thin layer of 3/4 clear aggregate (also referred to as 'base material') into the trench. This aggregate serves as the leveling bed for the first course of retaining wall blocks. Rake the aggregate to create an even surface and then use the plate compactor to thoroughly compact it. The aggregate's angular nature helps it lock into place with minimal compaction. This process ensures a stable and level foundation for the wall blocks.
Goal: Spread a thin layer of 3/4 clear aggregate into the trench and compact it to create a firm, level bed for the first course of retaining wall blocks.
Tools and materials
- Cat Skid Steer Loader
- Plate Compactor
- Rake
- Shovel
- 3/4 Clear Aggregate