Skip to main content

Lay and Level Initial Aggregate Base

6:40
14:14
84.7K views

At 6:40 in

Double Terraced Retaining wall crashes down pt2

What happens here

After the trench is compacted and the drain tile is in place, dump and spread a thin layer of 3/4 clear aggregate (also referred to as 'base material') into the trench. This aggregate serves as the leveling bed for the first course of retaining wall blocks. Rake the aggregate to create an even surface and then use the plate compactor to thoroughly compact it. The aggregate's angular nature helps it lock into place with minimal compaction. This process ensures a stable and level foundation for the wall blocks.

Goal: Spread a thin layer of 3/4 clear aggregate into the trench and compact it to create a firm, level bed for the first course of retaining wall blocks.

Tools and materials

  • Cat Skid Steer Loader
  • Plate Compactor
  • Rake
  • Shovel
  • 3/4 Clear Aggregate

What they say

Hide

with the sub-base material packed and ready to go he can now add enough material to bring it up to the bottom of his retaining wall but that still has to get past unlike class 5 or other materials that may be used as base this material does not need a lot of compaction to lock together in fact a light hit pretty much sets it in place the boys will add a touch of material where ever they feel they've got any low spots before the first block goes down he scans the base for imperfections looking for anything that doesn't look like it belongs

Auto-generated from the video audio.