Skip to main content

Initial Controlled Collapse and Debris Containment

0:00
8:02
19.1K views

At 0:00 in

Demolition -Point of View -Crawl inside the machine!

What happens here

Begin by using the excavator to strategically push and pull sections of the house, causing them to collapse inward. The goal is to fold the structure like a 'stack of cards' into the footprint of the house, specifically into the existing basement. This method prevents debris from scattering onto neighboring properties or sidewalks, ensuring a contained and safer demolition area. The excavator's bucket is used to methodically break apart the structure and guide the falling materials.

Goal: The initial phase of demolition involves a controlled collapse of the house, carefully 'folding in' the structure to contain all debris within the perimeter of the foundation and away from adjacent properties and public access ways.

Tools and materials

  • Kobelco SK160 Excavator
  • Standard Excavator Bucket

What they say

Hide

Today you will see from a bird's eye view what a house demolition looks like. And this house is located very close to the neighboring one. We're not just going to demolish this house. We'll actually fold it like a house of cards. This way, everything will remain within our site. It won't fall on the next house nearby. Nothing will fall on the sidewalk. Looking from a bird's eye view , notice how carefully we remove the center of this structure. Then we gently grab the edges of the building, fold them inward, and move all the debris into the basement. This particular house has an 8 foot deep basement. And we fill it completely. This gives us the opportunity to drive our car into a pile of garbage to get to that dangerous chimney. If you look at the very top of the house, at that chimney, you will see: if it falls uncontrolled, it

Auto-generated from the video audio.