Removing Concrete from Work Zone
At 0:27 in
Day2: Taking out an Old farm | Clearing the pasture, demolishing concrete & removing trees
What happens here
The ASV RT-75 Posi-Track utilizes its grapple attachment to meticulously break down and move large concrete blocks away from the immediate work area. The operator demonstrates precision in grabbing and repositioning the heavy, jagged concrete pieces. A key safety consideration is highlighted: the importance of preventing these large, potentially damaging blocks from getting underneath the machine's tracks, which could lead to severe equipment damage. The operator carefully drops the blocks into designated staging areas, ensuring they are positioned strategically for later removal.
Goal: Heavy equipment is used to systematically break apart and relocate large concrete blocks, preparing the area for further clearing while emphasizing careful operation to prevent machinery damage.
Tools and materials
- ASV RT-75 Posi-Track
- Grapple Attachment
What they say
(1,339 characters)Hide
What they say
(1,339 characters)Auto-generated from the video audio.