Initial Site Grading with Skid Steer

1:21
15:56
95.5K views

At 1:21 in

Day 2: Emergency Foundation repair

What happens here

Utilize the skid steer to rough grade the area adjacent to the garage foundation. This involves scraping away existing topsoil and debris to create a level working surface and to begin shaping the terrain to ensure proper water drainage away from the foundation once the project is complete. This is an early step to prepare the site, even before deadmen are fully in place or walls are backfilled.

Goal: Rough grade the area around the foundation for proper drainage

Tools and materials

  • Skid Steer Caterpillar — Grading and moving soil

What they say

Hide

I lifted the back of the truck right up [Music] the bullies grabbed the skid loader because they're going to need it to grade out this site to get all of the water to flow away from the foundation wall but that's two steps ahead of the game they've still got to get the rest of the dead men in place and the wall back filled with the right material [Music] yesterday we were able to get one dead

Auto-generated from the video audio.