Backfill and Final Grading
At 12:52 in
Day 1: Emergency Foundation Repair
What happens here
After the deadman anchors are in place and the wall has been adjusted, the excavated trenches are backfilled with soil. The mini excavator is used to move the displaced soil back into the trenches, carefully covering the deadmen and cables. Manual shoveling assists in compacting and leveling the backfill close to the foundation. Finally, the exterior area is regraded to ensure proper drainage away from the foundation, preventing future hydrostatic pressure buildup. The video concludes with the presenter explaining that this was just day one of the job, with more work on backfilling and regrading to follow in subsequent updates.
Goal: Bury the anchors and restore the exterior ground around the foundation.
Tools and materials
- Mini Excavator
- Shovels
- Soil
What they say
(1,659 characters)Hide
What they say
(1,659 characters)Auto-generated from the video audio.