Skip to main content

Rough Grading and Earthmoving

10:44
20:40
356.2K views

At 10:44 in

Customer is shot on my farm

What happens here

A compact track loader (ASV RT-75 Posi-Track skid steer) is brought in to commence the rough grading. The operator begins by cutting down significant mounds of existing red clay soil and transporting this material to other areas for use as fill. The objective is to establish the basic boundaries and shape of the new driveway system, including building up the sides and entirely covering up any old, unnecessary driveway entrances. This phase focuses on efficient bulk earthmoving to prepare the site for more precise work.

Goal: Utilizing a skid steer, large quantities of existing soil are moved to begin shaping the new driveway entrances and effectively cover up old, unused access points.

Tools and materials

  • ASV RT-75 Posi-Track Skid Steer
  • Existing Red Clay Soil

What they say

Hide

helicopter's ever been on our land i had heard someone had gotten shot in the head on my farm i didn't realize it was jeff my customer and so when i found out it was him i wanted to make sure that i brought you guys this story the bullet ricocheted off from the frying pan wrapped around the frying pan and hit him square in the head and he wasn't the shooter he was a good 30 feet to the side when all of this happened you just got to be careful what you shoot at i'll tell you right now you guys i watch demolition ranch one of my favorite channels but half of the stuff he shoots at i just shake my head going how how do you get away with that i don't [Music] know [Music] but now on this project what you're gonna see me do is use some of this fill soil to build out the sides of the future driveway so i've got this mound right here i'm going to cut that down and use that to establish the new driveway boundaries so i i'm filling in here so that as you guys you got a straight shot you have i i see your driveway moving over to here yep and then this i'm gonna contour down into the in into your yard you're okay with that dirt right there i'm gonna i'm just gonna put down seat okay okay good good good good um yeah i'm gonna take that bank right there steve how much you don't own that right okay okay but i'm gonna take jeff said i can take some of that hill out i'm gonna take that and i'm gonna move it right to here okay yep yeah i'm gonna take that i'm gonna take this hill i'm gonna bring it right to here so that way as you guys are coming in and out you got a very straight shot so i'll take i'll probably take almost up to that tree not down but i'm gonna contour up to that first tree so that that way we've got a nice flowing contour so one of the things i've got in the back of my mind is yes we are cutting in a new driveway entrance but we have an old driveway entrance that we've got to do some remediation on this these people don't need two driveway entrances to each of their homes so wherever their old driveway entrance is i need to cover that up with some soil that will hopefully provide some cover for some vegetation down the road so you'll see me working this from both angles i'll be building the new driveway and then covering up the old driveway

Auto-generated from the video audio.