Skip to main content

Install New Ceiling Joists

18:05
20:53
184.1K views

At 18:05 in

Creating Open Concept in 6 Old Abandoned House

What happens here

With most of the demolition complete, the worker begins the process of installing new ceiling joists. He takes measurements to ensure proper placement and cuts new wooden beams to size using a miter saw. These new joists are then installed to create a level and secure ceiling structure, replacing the poorly supported original framework. This step is crucial for establishing a solid foundation for the new kitchen ceiling and lighting.

Goal: Reinforce and level the kitchen ceiling structure.

Tools and materials

  • Level — Ensuring new joists are level
  • Measuring Tape — Accurately measuring the length needed for new joists
  • Miter Saw Ryobi — Cutting wooden beams to precise lengths
  • Nail Gun Ryobi — Securing the new joists in place
  • Wooden Beams/Joists — New structural supports for the ceiling

What they say

Hide

ready to [Music] well damn I bought the wrong Hardware these are the hurricane ties and I was going to have it match this ceiling here not drop down but I have to lift the other end up another 4 in which I don't want to do so I guess I have to do ceiling joist hangers here that way it's lined up nice and leveled damn it wrong Hardware it gets you every time [Music] come [Music] on [Music]

Auto-generated from the video audio.