Lay Gravel Base and First Course of Blocks
At 10:12 in
Crazy Neighbor Loses it & Calls the building Inspector 5 times!
What happens here
Once the trench is excavated and leveled, spread a layer of crushed gravel across the bottom. The gravel layer should be approximately 6 inches deep and extend a few inches beyond the front and back of the first course of blocks. Use a plate compactor to thoroughly compact the gravel, ensuring a firm and level base. Then, carefully lay the first course of retaining wall blocks directly on the compacted gravel. Ensure each block is perfectly level from front to back and side to side, and that the entire course is straight. Use a rubber mallet and a level to make adjustments as needed. This first course is critical for the overall stability and appearance of the wall.
Goal: Establish a stable foundation by spreading a layer of crushed gravel in the excavated trench, compacting it, and then carefully laying the first course of retaining wall blocks.
Tools and materials
- Level
- Plate Compactor
- Rubber Mallet
- Shovel
- Wheelbarrow
- Crushed Gravel
- Retaining Wall Blocks