Skip to main content

Equipment Preparation and Transportation

0:05
12:48
111.7K views

At 0:05 in

Crashed the Volvo skid steer prepping a lot for a Blizzard 4 k video

What happens here

The initial phase of snow removal operations involves preparing the heavy equipment, which includes a compact track loader (skid steer) and an attached snow pusher. The equipment is then loaded onto a trailer and safely transported to various job sites. This step highlights the logistical aspects of mobilizing machinery across different locations, such as commercial parking lots and residential driveways.

Goal: Safely prepare and transport all necessary heavy machinery to snow removal sites.

Tools and materials

  • Compact Track Loader — The primary machine for snow removal
  • Snow Pusher Attachment Arctic Sectional — Attaching to the skid steer for pushing large volumes of snow
  • Tow Vehicle — Hauling the trailer
  • Trailer — Transporting the skid steer

What they say

Hide

windshield friend [Music] still remember cannot forget flower in your

Auto-generated from the video audio.