Lay and Level the First Course of Blocks
At 3:19 in
Common Retaining wall mistakes & how to AVOID THEM, bad designs, bad base, wrong block....#2
What happens here
Carefully place the first course of interlocking blocks onto the prepared base material. Use a level (spirit level) to ensure each block is perfectly level both front-to-back and side-to-side. The presenter demonstrates how the bubble in the level should ideally be centered. A slight forward tilt (bubble leaning towards the front) is acceptable and even beneficial, as it compensates for the geogrid fabric that will be installed behind the blocks, which tends to lift the next course. Use a dead blow hammer (or a 2x4 with a framing hammer) to gently tap blocks into precise alignment and level. This is a critical step, as the stability and appearance of the entire wall depend on the first course being perfectly set.
Tools and materials
- Block Lifter VersaLifter
- Dead Blow Hammer
- Framing Hammer
- Interlocking Blocks
- Level Stanley FatMax
- Safety Glasses
- Wood (2x4)
- Work Gloves
What they say
(2,500 characters)Hide
What they say
(2,500 characters)Auto-generated from the video audio.