Grade and Shape Pond Access Ramp
8:55
25:07
220.9K views
At 8:55 in
Clearing out swamp land on the farm during a wet rainy week
What happens here
After initial clearing, the operator focuses on the pond access point. Using the ASV RT-75, material from the muddy bank is pushed into the water and then pulled back, creating a gradual, stable ramp. The bucket is used to 'flat-top' or smooth the ground, making the surface as even as possible. This grading ensures rainwater drains away from the barnyard and directly into the pond, preventing puddles and mud. The tracked loader's ability to 'float' over soft ground is critical for this task, allowing work to be done without getting stuck or creating deep ruts.
Goal: Create a stable, sloped access ramp to the pond
Tools and materials
- Front Bucket Attachment Case — Pushing and smoothing terrain
What they say
(2,460 characters)Hide
What they say
(2,460 characters)Auto-generated from the video audio.