Skip to main content

Fill Deep Cracks and Apply Final Epoxy Coats

1:00
21:59
43.8K views

At 1:00 in

CHEAP but BEAUTIFUL Bathroom remodel. Problems with the LOG sink

What happens here

For deep cracks in the sink basin, apply furnace tape to the outside of the cracks to create a temporary dam. Pour epoxy resin directly into these taped cracks, allowing it to thoroughly fill the voids. The furnace tape is preferred over painter's tape, as the epoxy can dissolve the adhesive of painter's tape. After the crack filler cures, remove the tape. Continue applying multiple coats of epoxy to both the sink basin and the black walnut shelves, ensuring full coverage and a smooth, glossy finish. The video implies 10-11 coats were needed for the sink basin to achieve a permanent watertight bond, allowing sufficient drying time (4-5 hours between coats, up to 24-48 hours for final cure) for each layer.

Goal: Address major cracks in the sink basin using furnace tape and epoxy, then apply multiple final coats to both the sink and shelves for a durable, watertight finish.

Tools and materials

  • Disposable Gloves
  • Paint Brush
  • Furnace Tape
  • Two-Part Epoxy Resin

What they say

Hide

this really Plain Jane and boring but we've still got a long way to go before we're ready to unveil it to her later today so what are we waiting for let's get this show going the total cost of this project including the walls the shelves the faucet everything under $500 [Music] okay okay so you're gonna do what I'm gonna go say to my Center where my Jane's gonna be with a small fit for a

Auto-generated from the video audio.