What happens here
Once the pool structure is broken, the mini excavator begins moving the debris and initial fill material. Working in conjunction with a Case SV300 skid loader, the excavator digs and pushes earth and broken concrete into the pool basin. The skid loader then works to spread and level the material. This collaborative effort demonstrates efficient earthmoving, with the excavator handling the primary digging and large material movement, and the skid loader performing grading and spreading tasks.
Goal: Fill the demolished pool basin with earth and debris, beginning the grading process.
Tools and materials
- Case Mini Excavator Case — Digging and moving debris and earth
- Case SV300 Skid Loader Case — Spreading and rough grading of fill material