Skip to main content

Initial Backfilling and Rough Grading

2:49
5:40
71.4K views

At 2:49 in

Case Excavator -Heavy Equipment Review

What happens here

Once the pool structure is broken, the mini excavator begins moving the debris and initial fill material. Working in conjunction with a Case SV300 skid loader, the excavator digs and pushes earth and broken concrete into the pool basin. The skid loader then works to spread and level the material. This collaborative effort demonstrates efficient earthmoving, with the excavator handling the primary digging and large material movement, and the skid loader performing grading and spreading tasks.

Goal: Fill the demolished pool basin with earth and debris, beginning the grading process.

Tools and materials

  • Case Mini Excavator Case — Digging and moving debris and earth
  • Case SV300 Skid Loader Case — Spreading and rough grading of fill material

What they say

Hide

first on the list. So, how do you like it? I like it. This is a brand new car. What's not to like here? Yes, but isn't there anything that could be improved about it? A . Is that all? Seriously, come on , man. There must be something you would like to change about this car. O. O. You are truly amazing in front of the camera, Tim. Do you know how much of this I'll have to cut out? I will do: cut, cut, paste, paste, cut. This is the best technique I have ever operated. This is the best technique I have ever operated. Outstanding. I would be happy to work on it anywhere. Easily gets on and off the trailer . Just like my ex-wife. It

Auto-generated from the video audio.