Initial Grading of the Building Pad

6:52
11:37
10.4K views

At 6:52 in

Building the House Pad 4K

What happens here

With the driveway roughed in, focus on the building pad. Use the skid steer to distribute soil and bring the pad close to its final desired height. The goal is to create a slightly elevated base, approximately 2 inches higher than surrounding areas, to facilitate proper drainage away from any future structures. This initial grading ensures that the pad is generally level, preparing it for the more precise final grading.

Goal: Bring the building pad to a near-final, slightly elevated level for drainage.

Tools and materials

  • Bucket/Blade Attachment — Spreading and leveling dirt
  • Skid Steer Loader Caterpillar — Rough grading of the building pad

What they say

Hide

think that's pretty cool so here's where I'm at with things I've got the building pad itself pretty close but I wouldn't mind having it just be a little bit higher uh cuz I'd rather have I've always my personal experience is people set houses too low if you set a house too high you can always grade up to it but if you set it too low you're basically screwed I've seen Builder after Builder doing it so I want to bring that pad up just another 2 in over the entire thing but we've got the driveway cut in and that looks good and this whole area looks good so I think we can hopefully the next phases of this project but let's finesse this pad let's do that