What happens here
With the foundation and main beam in place, the next step involves installing the 2x10 pressure-treated floor joists. The creator and a helper (Ben) position each joist into the previously installed 2x10 hangers. The joists are then secured into the hangers using exterior-grade nails. The creator explicitly mentions using nails and jokes about using screws if one is a 'baller,' implying nails are sufficient and cost-effective for this application.
Goal: Securely attach all floor joists to the main beam using hangers and exterior nails
Tools and materials
- 2x10 Floor Joists — Creating the horizontal support structure for the deck
- 2x10 Hangers — Providing a strong connection point for joists to the main beam
- Exterior Nails — Securing the joists within the hangers and to the frame
- Framing Hammer — Driving nails to secure the joists
- Safety Glasses — Protecting eyes during hammering