Skip to main content

Constructing New Ponds: Site Selection and Excavation

9:00
31:46
7.8K views

At 9:00 in

Building a Pond on Your Property? WATCH THIS FIRST

What happens here

For constructing a new pond, choose a suitable location that allows for natural water accumulation (e.g., a low-lying area or 'holler' where water naturally flows). The presenter describes digging a pond that is solely fed by groundwater (a dug-out pond). Ensure that the chosen site has a high clay content in the soil to prevent leaks. If the soil lacks sufficient clay, a pond liner (like bentonite or plastic sheeting) may be required to seal the pond. The presenter successfully used a product called 'Damit' (a rapid leak sealer) to seal a leaky pond after construction. When excavating, create sloped or stepped sides to allow wildlife to easily enter and exit the pond.

Goal: Excavate and seal a new pond effectively, considering water source and wildlife safety.

Tools and materials

  • Excavator CASE CX210D — Digging the pond basin and shaping the landscape
  • Truck — Hauling fill dirt if needed
  • Damit Rapid Leak Sealer Shalex — Sealing leaks in clay-deficient ponds