Surface Preparation (Deslagging, Shot Blasting, Washing, Drying)
At 7:53 in
Building a PLOW from Scratch in 3 hours 4K
What happens here
Before powder coating, the raw metal components undergo a thorough preparation process. First, they are moved to a 'deslagging' station where a worker scrapes off any slag or sharp edges remaining from previous cutting and welding operations. Then, they are hung onto a conveyor system that carries them through a multi-stage cleaning and pretreatment line. This includes shot blasting (where small metal BBs are thrown at the parts at high speed to clean the surface), followed by washing and drying. An engineer explains the system, noting that it uses eight 20-horsepower electric motors to power the shot blasting wheels. This extensive preparation ensures optimal adhesion of the powder coat and prevents rust.
Goal: Prepare metal surfaces for optimal powder coating adhesion and rust prevention.
Tools and materials
- Forklift Toyota — Moving bundles of parts to the conveyor
- Overhead Conveyor System — Transporting parts through the preparation line
- Scraping Tool — Removing slag and burrs from metal surfaces
- Shot Blasting Machine — Cleaning metal surfaces with abrasive 'BBs'
- Washers and Dryers — Cleaning and drying parts after shot blasting
- Chemical Pretreatment — Applied during washing to aid rust prevention and paint adhesion
- Metal BBs — Abrasive material for shot blasting
- Metal Components — Parts requiring surface preparation
What they say
(869 characters)Hide
What they say
(869 characters)Auto-generated from the video audio.